Ordering & Timelines

How do I check if I can get a product by a date and see the price at my quantity?

Short answer

Open the product page, enter your quantity to see the price at that tier, then read the production time and delivery estimate. Compare it with your in-hands date. For a firm price and date together, create a free estimate, then confirm the timeline with your rep. Production starts only after proof approval and payment.

  • Price and minimum change by quantity, so enter your real quantity first.
  • The product page shows its own production time and delivery estimate.
  • Production days count business days; shipping transit is extra.
  • An estimate locks pricing for 30 days, but dates remain estimates.
  • Faster options exist, and a rush surcharge may apply.

Price and timing both depend on the product, the quantity and the decoration. The product page puts them side by side, so you can check both in one visit.

What to read on the product page

  • Quantity and price tiers. Prices are per unit and get lower at higher quantities. Check the minimum order too. Some items have none.
  • Production time. Each product page shows its own time. Quote that number, not a general rule.
  • Delivery estimate. The page adds transit time, which depends on distance and where the item ships from.
  • Imprint methods. The method you pick affects the timeline. Standard production is typically 7-10 business days for most methods and 10-14 for embroidery. Your product page shows the exact time.
  • Setup charges. The "Setup & Pricing" section shows any one-time setup per imprint method, so your total is clear.

How the clock actually works

Production time counts business days, so weekends do not count. It starts once your proof is approved and the order is paid. Approved business accounts on terms start as soon as the proof is approved. Shipping transit is extra.

That means a slow proof approval or a late payment can cost you days. Work backward from your in-hands date, which is the date you need the items delivered, and leave a one-day buffer. Production and delivery dates are estimates, not guarantees.

If your date is tight

Three speed levels exist. Standard has no rush surcharge. Rush is typically 3-5 business days for most methods, with priority production and a same-day proof, and a surcharge may apply. Super Rush is 24-48 hours on select products and methods only, so call your rep to confirm. Your rep confirms any surcharge before you approve.

You can browse rush products to see what can be made fast. Drinkware and desk items can be ready in as little as 24 hours, and bags and tech in as little as 3 days.

Common mistakes

  • Checking price at a default quantity instead of your real one.
  • Forgetting that transit time comes after production.
  • Approving the proof late or paying late.
  • Picking a method that takes longer, such as embroidery, when your date is close.
  • Ordering after the 4 PM Pacific cutoff and expecting same-day processing.

To speed things up, send vector art, include PMS colors up front, use a single imprint location, approve the proof quickly and pay promptly.

Lock it in with an estimate

Create an estimate from the product page. You get a PDF quote with pricing locked for 30 days. Share your in-hands date with your account manager so they can confirm the timeline before you accept.

Step by step

  1. Set your quantity

    Open the product page and enter the quantity you really need. Note the price at that tier and the minimum order.

  2. Check production and delivery

    Read the production time and the delivery estimate. Remember that production counts business days and transit is extra.

  3. Work back from your date

    Start at your in-hands date and subtract transit, production and proof approval time. Add a one-day buffer.

  4. Compare imprint methods

    Choose a method that fits your timeline. Embroidery typically takes longer than screen print or laser engraving.

  5. Create an estimate

    Generate a free estimate to lock the price for 30 days and get a PDF quote.

  6. Confirm with your rep

    Share your in-hands date and ask about Rush if the standard timeline is too long. Your rep confirms any surcharge before you approve.

Products that work for this

Real examples from our catalog, with live pricing. Tap one to see it with your logo.

Shop Drinkware

See all →

People also ask

When does production time start?

It starts once your proof is approved and the order is paid. Approved business accounts on terms start as soon as the proof is approved. Production counts business days, and shipping transit is extra.

Does the estimate guarantee my delivery date?

No. Production and in-hands dates are estimates, not guarantees. The estimate locks your pricing for 30 days, so confirm the timeline with your rep.

What if the standard timeline is too long?

Ask about Rush, typically 3-5 business days for most methods, or Super Rush at 24-48 hours on select products. A surcharge may apply, and your rep confirms it first.

What is an in-hands date?

It is the date you need the products delivered to you. Plan backward from it and add a one-day buffer.

PromoAI · our AI shopping assistant

Ask PromoAI these questions

Tap one and PromoAI searches our live catalog and answers in seconds.

Was this answer helpful?

Written with AI assistance and reviewed by the Promogator team. Our editorial standards